• Project Type:  Working closely with the project architect and civil engineer, MLA developed a landscape plan for the 100 acre site located in southeastern Winston-Salem. In an effort to achieve LEED certification and create a sustainable campus, MLA utilized native and drought tolerant plant material, and minimized turf grass to reduce required maintenance, fertilization, and chemical applications. These improvements in combination with the existing mature hardwood forest areas and the stormwater management ponds on campus will create new (and restore once existing) wildlife habitat on this property.
  • Services:  Services included Site Due Diligence and Investigation, Site Analysis, Overall Campus Landscape Planning, Stormwater Pond Planting Design, Monument Signage Concept Plans, Office Entry Plaza Design, and Campus Walking Trail Design and Implementation
  • Location:  Winston-Salem, NC